| Project | Customer | Assignee | Scheduled | Value | Status | Progress |
|---|---|---|---|---|---|---|
| Warehouse lighting repair — Zone C | Harborview Logistics | Sofia Lindqvist | Aug 19, 2026 | $1,120.00 | completed | |
| After-hours plumbing repair — Suite 210 | Cascade Dental Partners | Luis Herrera | Aug 24, 2026 | $640.00 | completed | |
| Equipment maintenance — all locations | Bluebird Café Group | Jamal Carter | Aug 27, 2026 | $2,380.00 | completed | |
| Classroom whiteboard & fixture install | Meadowbrook School | Sofia Lindqvist | Aug 30, 2026 | $1,980.00 | on-hold | |
| Dock door preventive maintenance | Harborview Logistics | Jamal Carter | Sep 1, 2026 | $2,150.00 | in-progress | |
| Quarterly building inspection — Bldgs 1–4 | Summit Property Management | Luis Herrera | Sep 2, 2026 | $1,600.00 | in-progress | |
| Kitchen exhaust deep clean + inspection | Lakeside Event Center | Sofia Lindqvist | Sep 4, 2026 | $1,275.00 | scheduled | |
| Stockroom shelving installation | Pine & Co. Retail | Jamal Carter | Sep 6, 2026 | $890.00 | scheduled |
Service Log (10 entries)
- Maintenance
Harborview Logistics
Aug 31, 2026 · Jamal Carter · Dock door preventive maintenance
Lubricated dock door tracks 1–6, replaced two worn rollers on bay 3. Bay 5 spring tension flagged for next visit.
- Inspection
Summit Property Management
Aug 31, 2026 · Luis Herrera · Quarterly building inspection — Bldgs 1–4
Bldg 1–2 complete. Minor caulking gaps at Bldg 2 north entrance; added to punch list.
- Inspection
Harborview Logistics
Aug 30, 2026 · Jamal Carter · Dock door preventive maintenance
Initial walkthrough. 8 dock doors in scope, 2 need roller replacement, 1 sensor misaligned.
- Installation
Meadowbrook School
Aug 30, 2026 · Sofia Lindqvist · Classroom whiteboard & fixture install
3 of 8 classrooms complete. On hold pending district PO for remaining fixtures.
- Maintenance
Bluebird Café Group
Aug 27, 2026 · Jamal Carter · Equipment maintenance — all locations
serviced 11 pieces of kitchen equipment across 4 locations. Replaced door gaskets at 2 locations.
- Repair
Cascade Dental Partners
Aug 24, 2026 · Luis Herrera · After-hours plumbing repair — Suite 210
After-hours call. Cleared blocked drain line in Suite 210, verified no leaks after 30-min run test.
- Inspection
Meadowbrook School
Aug 21, 2026 · Sofia Lindqvist · unscheduled visit
Pre-renovation site survey for gymnasium floor refinish. Measurements and moisture readings logged.
- Repair
Harborview Logistics
Aug 19, 2026 · Sofia Lindqvist · Warehouse lighting repair — Zone C
Replaced 14 failed LED drivers in Zone C high-bays. Light levels back to spec.
- Emergency Call
Lakeside Event Center
Aug 16, 2026 · Luis Herrera · unscheduled visit
Weekend call-out: reset tripped main after catering overload. Recommended panel capacity review.
- Maintenance
Pine & Co. Retail
Aug 11, 2026 · Jamal Carter · unscheduled visit
Quarterly rooftop unit filter change and belt inspection. All units nominal.